How to Calculate a Renovation Budget

Renovation is not one price per square meter. Scope/standard/structure/materials/labor/permits/design change the total; set scope, quote line by line, keep 10-20% contingency.

更新 2026-11-01 · 公式可核验

Components

Materials/fixtures.

Labor/management.

Permits/design/structure.

Contingency/furnishing.

Overruns

Scope changes.

Hidden issues (utilities/structure).

Material upgrades.

FAQ

How much contingency?

10-20%; more for old homes/structure/utilities.

How to compare quotes?

Same scope/materials/brands/timeline; compare line by line.

Sources