How to Calculate a Renovation Budget
Renovation is not one price per square meter. Scope/standard/structure/materials/labor/permits/design change the total; set scope, quote line by line, keep 10-20% contingency.
Components
Materials/fixtures.
Labor/management.
Permits/design/structure.
Contingency/furnishing.
Overruns
Scope changes.
Hidden issues (utilities/structure).
Material upgrades.
FAQ
How much contingency?
10-20%; more for old homes/structure/utilities.
How to compare quotes?
Same scope/materials/brands/timeline; compare line by line.