Quick answer
After Basement, spot-check the output, then decide whether to delete/archive the original; keep a backup. Basement depends on waterproofing/insulation/height/egress/permits.
Why it matters
A backup lets you roll back if the output is wrong.
Waterproof.
Step by step
- Set scope/standard/structural work/occupancy.
- Separate materials/labor/permits/design/contingency.
- Get at least three itemized quotes on same scope/brands/timeline.
- Contract states payment/change orders/delays/warranty.
Common mistakes
- Comparing totals without scope/materials.
- No 10-20% contingency.
- Ignoring permits/structure/utilities.
- No change-order/delay terms.
Checklist
- Scope/standard/structure/occupancy.
- Materials/labor/permits/design.
- Quotes/brands/timeline/payment.
- Changes/delays/warranty/acceptance.
- Contingency/cash flow/insurance.
Key facts
- Waterproof.
- Insulation.
- Egress.
FAQ
What should I do after Basement?
After Basement, spot-check the output, then decide whether to delete/archive the original; keep a backup. Basement depends on waterproofing/insulation/height/egress/permits.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: BlueBook