Home/Answers/Timeline
RENOVATION COST LAB / Timeline

Comparing Timeline Results

To compare Timeline results, keep input, format and settings fixed and change one variable.

Updated 2026-11-01About 3 minLocal test
Quick answer

To compare Timeline results, keep input, format and settings fixed and change one variable. Timeline depends on scope/materials/permits/weather/contractor schedule.

Why it matters

Changing several variables at once makes results unattributable.

Scope.

Step by step

  1. Set scope/standard/structural work/occupancy.
  2. Separate materials/labor/permits/design/contingency.
  3. Get at least three itemized quotes on same scope/brands/timeline.
  4. Contract states payment/change orders/delays/warranty.

Common mistakes

  • Comparing totals without scope/materials.
  • No 10-20% contingency.
  • Ignoring permits/structure/utilities.
  • No change-order/delay terms.

Checklist

  • Scope/standard/structure/occupancy.
  • Materials/labor/permits/design.
  • Quotes/brands/timeline/payment.
  • Changes/delays/warranty/acceptance.
  • Contingency/cash flow/insurance.

Key facts

  • Scope.
  • Materials.
  • Schedule.

FAQ

How do I compare two Timeline results?

To compare Timeline results, keep input, format and settings fixed and change one variable. Timeline depends on scope/materials/permits/weather/contractor schedule.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: BlueBook