Home/Answers/Design
RENOVATION COST LAB / Design

After Design Processing

After Design, spot-check the output, then decide whether to delete/archive the original; keep a backup.

Updated 2026-11-01About 3 minLocal test
Quick answer

After Design, spot-check the output, then decide whether to delete/archive the original; keep a backup. Design fees depend on area/scope/renderings/construction drawings.

Why it matters

A backup lets you roll back if the output is wrong.

Area.

Step by step

  1. Set scope/standard/structural work/occupancy.
  2. Separate materials/labor/permits/design/contingency.
  3. Get at least three itemized quotes on same scope/brands/timeline.
  4. Contract states payment/change orders/delays/warranty.

Common mistakes

  • Comparing totals without scope/materials.
  • No 10-20% contingency.
  • Ignoring permits/structure/utilities.
  • No change-order/delay terms.

Checklist

  • Scope/standard/structure/occupancy.
  • Materials/labor/permits/design.
  • Quotes/brands/timeline/payment.
  • Changes/delays/warranty/acceptance.
  • Contingency/cash flow/insurance.

Key facts

  • Area.
  • Renderings.
  • Drawings.

FAQ

What should I do after Design?

After Design, spot-check the output, then decide whether to delete/archive the original; keep a backup. Design fees depend on area/scope/renderings/construction drawings.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: BlueBook